Over the decades FCI has been striving to upgrade its technology continuously. Steps are being taken from time to time to incorporate the latest quality control, cost saving equipments, and environmental friendly equipment along with other state of the art technology in the field of cement manufacturing as far as possible.

FCI has undertaken several upgradation and modernization projects increasing the clinker and cement production capacity in consultation with world renowned company, M/s Krupp Polysius , Germany as Consultants for all the expansion projects.

FCI UPGRADATION PROJECTS

2010
NEW LINE OF PRODUCTION (UNIT – II) & THERMAL POWER PLANT 40 MW

A new line of production (Unit II), one of the most modern and highly sophisticated plant with six stage double string DOPOL’90 pre-heater incorporating DOPOL calciner, POLRO twin tyre kiln and a polytrack cooler with a capacity of 2.4 million tons of clinker per annum was erected parallel to the existing factory. Hence becoming the largest cement plant of UAE with the combined production capacity of 4 million tons of clinker per annum.
We have also commissioned our own Thermal Power Plant of 20 MWx2 (total 40 MW) for generating power to meet the in house power requirement.